Saturday, 22 September 2012

Week 7

In this week, we have 2nd briefing fyp which held at Gemilang Hall  which date 13 September 2012 Thursday around 4.00 pm. In this briefing, they explains about how to do the final reports.
   Presentation / Product demo-W14(Thursday)
   Logbook-W15
   Final Report-W15(Draft)
                     -W17(Hard cover to library)

As a conclusion, we must follow the format of FYP report and refer FYP report guideline.

At the same time, my partner and i also plan to do etching. So we go to PCB Laboratory Workshop to do it at 1st floor.
                         
  1) We put the print circuit trasparent at the UV Box. After that, we put the UV board at the top print circuit and do the process 60s.


2) After that, we put the develop and pour and mix with the water then shake it. This process want to make the circuit appear at UV board.


3) Thus, after done shake, we transfer the PCB into etching tank and do the operation for 4-5 minutes.


4) Lastly,after the process and operation already done, we use sand paper to clean the circuit board. Finally, the circuit appear.

                     

-This is my friend which help me doing the develop etching PCB togethers. Thanks you my friends. (^_^)
                                             

Sunday, 9 September 2012

Week 6

"Intra Briefing"

In this week, we have a intra briefing which held at TTL 1 around 4.00 pm. The briefing was conducted by the incharges intra, Azmi Tajuddin. He also explains about Industrial Training Briefing S1/2013(INTRA S1/2013). The intra that must be take by all student will be start in 7 Jan-27 April 2013 around 16 week. Its also give a advice and guidance to the students which required to find industrial placement within this semester.

> At the same time, he also give guidance how to research the company in webs :
-www.yellowpages.com.my
-www.superpages.com.my

>Step to company research

> Application Documents :
-official cover letters
-reply form
-student resume (not more 2 pages,picture,detail of your contact nummbers and latest CGPA).

> Confirmation of placement.

Tuesday, 4 September 2012

Week 5

In this week, as we plan before with my partners, we want to construct the circuits on the breadboard. However, to construct the circuits we look and follow the schematics diagrams that we take from the magazine.


There is a schematics diagram that we want to construct on the breadboard.



We check and collect all the component is already have, so we can prepare to start construct at the breadbboard.




Now, finally there is a result that my partners and i already finish construct the circuits on the breadboard and testing it if the circuits is functioning or not.