Saturday, 10 November 2012

Week 14

In this week is the last week for fyp project for all students that we must present on due date. Alhamdulillah, the Final Year Project (FYP) is already over with successfully. First of all, i would like to thank to my supervisor, Sir Izwan Arief Bin Abd Malik with give a lot help, opinions, courage, ideas, encouragement and others for our Final Year Projects. In addition, my partners and i very happy and proud because we are successfully done for the project with my friends from week 1 until week 13. As we know, diploma student will be placed around admin building while degree students will be placed at the Gemilang Hall. The exhibition will be start at 9.00 a.m until 1.00 p.m. Besides that, during presentation for our project we have 2 assessors that will access our fyp project. Lastly, after ends it will announce the winner for the best FYP project and top 20. At below have a picture my partners and i, my friends with very happy smiles...  :)

My partners and i with our project "Water Level Detector"


I'm with my friends after the exhibition ends with happy smiles.

Thanks you my partners, my friend, my supervisor which help us to complete our project with successfully. :)



Friday, 9 November 2012

Week 13

For week 13, we have a final intra briefing which held at TTL 2. So my friend and i plan to go that briefing, the coordinator that be explain about industrial training is Sir Azmi Tajuddin. In explaination its about the final step briefing and give the advice to alert and pay attention about highlight dates, submission dates,submission reply form, letter form and resume. At the same time, he also tell about the last date for find the place for industrial training. So we must make sure that can find the place for intra training due to the date. Besides that, for industrial training that starts in early year 2013, we must register first in the form and we also must know what to do during the industrial training.

In addition, my friend and i plan to design and print the FYP posterwith the size of A1. The poster that we design we used to present in exhibition day at week 14. The FYP poster we put and placed at our booth and in our content in FYP poster we must follow the guideline that given and make a details information such as introduction, abstract, objective, methodology, results, reference, conclusion and others important imformation. Make sure the project is done and understand all the circuit operation and each components that being used.


Week 12

In this week, i'm planning with my partners to make some renovation and modification at my project. We also created a model for our project water level detector to be ready and make sure we can present our project in week 14 which start 8 november 2012 in thursday. The model prototype that we created is simple, when we have a model, it can become easy to present at our assessors. So they can more understand and know about scope of our project.